This project involved the construction of a new Water Purification Suite within an existing building (Building 4) on the live pharmaceutical site.
The new Purification Suite extends approx. 900m2 over 2 levels and included the following; Production Area; Materials Staging Room; Wash Room; Used Parts Room; Laboratory for In-Process Testing; Control Room all at Ground Level and Plant Room & Technical Spaces located on the first floor.
The Purification Suite design reflects FDA current Good Manufacturing Practices (GMP) and incorporates ICH guidelines to facilitate HPRA registration requirements. All aspects of the facility design and construction considered the Factory Mutual (FM) standards to facilitate FM Global inspection and insurance.
Ireland
Collen Construction
2021
Completed
€11m
We supported our client on the project with BIM modelling production for the civil services.