The Project

LOCATION

Zarate City, Argentina

PROJECT COST

€20m

SIZE

22,872 sq/m

CLIENT

Arauco and BRAF

PROJECT COMPLETION

October, 2022

COST SAVINGS

€74,000

DCT proudly partnered with BRAF at the ARAUCO FAPLAC factory in Zarate City, Argentina. The factory required the replacement of large essential production systems in just two days, presenting a challenging task. To achieve this, we had to carefully plan and coordinate the movements of cranes and the assembly process. This planning was absolutely crucial for the success of the project. The factory’s limited space made the task even more complex, emphasising the need for precision and coordination in every step of the process.

Through precise laser scanning and advanced 4D BIM planning, we enabled the digital transformation of ARAUCO FAPLAC's essential production system replacement, delivering enhanced safety, reduced downtime, and efficient project execution.

The challenges

Rigorous time constraints

The factory required the replacement of essential production systems within just two days, demanding meticulous planning and precise execution to minimise disruption to operations. The urgency of the timeline presented a considerable challenge, as ensuring minimal impact to ongoing production while completing the work within the short timeframe was critical.

Complex crane movements

Coordinating crane movements and assembly sequences for the replacement of large production systems in a confined industrial setting posed a significant challenge. This required careful planning to optimise space and ensure safe and efficient execution of each step, while avoiding any interference with existing equipment or operations.

Data accuracy and integration

Ensuring the accuracy of the laser scan data and seamlessly integrating it into the BIM modelling process was a challenge. Any discrepancies or errors in data collection or modelling could have led to potential issues during the project execution. The need for high accuracy was essential to prevent rework and delays during the tight execution timeline.

The solutions

Stage 1 - Laser scan

In the initial stage of the project, we conducted a precise laser scan of the ARAUCO FAPLAC factory’s facilities. Using advanced laser scanning technology, we captured highly accurate data on the existing structures, equipment, and layout. This detailed point cloud dataset provided BRAF with a comprehensive and accurate digital representation of the factory’s as-built conditions. It was instrumental in the subsequent planning and execution stages, ensuring that every decision was made with full knowledge of the existing environment.

Stage 2 - BIM modelling

Utilising the data from Stage 1, we created a detailed BIM model of the existing facilities, including auxiliary and safety elements. This model facilitated a 4D simulation that BRAF used to validate the planning for the technical personnel involved before the work commenced, ensuring no errors or clashes in the planned system replacement.

4D BIM planning

To tackle the time constraints and intricate crane manoeuvres, we employed advanced 4D BIM technology. By integrating time as the fourth dimension, we were able to create a simulation that visualised the entire project timeline. This allowed us to plan effectively, foresee potential challenges, and collaborate closely with BRAF’s technical team. The 4D BIM model optimised crane movements, ensured precise sequencing, and maintained a clear and coordinated execution plan for all involved.

 

Comprehensive clash detection and resolution

We incorporated advanced clash detection protocols into the BIM process to identify and address design conflicts early. By resolving clashes during the design phase, we reduced the risk of costly rework and delays during construction. This proactive approach ensured that all systems were seamlessly integrated and optimised for efficiency.

“DCT has been an invaluable partner in our essential production system replacement at the ARAUCO FAPLAC factory. Their 4D BIM expertise allowed us to plan and execute the project seamlessly, meeting our two-day deadline and minimising downtime. DCT’s commitment to safety and precision has exceeded our expectations, making them a trusted partner in our project.”

ARAUCO & BRAF

Value delivered

Efficient planning

DCT’s use of laser scanning and 4D simulation allowed for efficient and precise planning, ensuring minimal disruption to the factory’s operations during the essential production systems replacement. This detailed planning process helped maximise productivity and reduce the impact on the factory’s ongoing production.

Enhanced safety

Our careful planning and use of 4D BIM technology ensured not only efficiency but also a high level of safety during the production system replacement. By identifying and mitigating potential safety risks in advance, we provided BRAF with peace of mind, ensuring a secure working environment for their technical personnel and minimising the risk of accidents or incidents during the operation.

Reduced downtime

Through our precise planning, efficient execution, and the use of 4D BIM, we significantly minimised downtime at the ARAUCO FAPLAC factory. Completing the production system replacement within the stipulated two-day period allowed BRAF to avoid prolonged interruptions to their operations, reducing potential revenue losses and ensuring uninterrupted productivity.

The outcome

In conclusion, our collaboration with BRAF on the ARAUCO FAPLAC factory’s production system replacement project highlights our commitment to innovation, precision, and efficiency. We successfully navigated tight time constraints and complex crane manoeuvres, thanks to our advanced 4D BIM technology and laser scanning expertise. This allowed us to achieve both safety and operational excellence, reducing downtime and exceeding expectations. DCT remains dedicated to delivering tangible value to our partners, solidifying our reputation as a trusted BIM provider.