The factory required the replacement of large essential production systems in just two days, so planning crane movements and assembly sequences was crucial.
To achieve this, we divided the project into two stages. In Stage 1, we carried out a laser scan, providing BRAF with accurate information of the as-built facilities. Then, in Stage 2, we utilised this data to perform a detailed BIM model of the existing facilities, auxiliary elements, and safety elements, to verify the feasibility of the manoeuvers and the existing space. This resulted in a 4D simulation that BRAF used to validate the planning for the technical personnel involved prior to completing the work.
We supported our client on the project’s BIM Modelling, 4D Planning, and Laser Scanning to provide an accurate and detailed 4D simulation.Â