Resolving complex mechanical, electrical, and piping runs requires genuine trade understanding, not just software execution. We federate multidisciplinary models under ISO 19650 standards to establish constructable routing priorities, verify maintenance access, and clear the path for site teams before installation starts.
Bridging Engineering Intent and Construction Delivery
Dense mechanical, electrical, and piping systems demand strict spatial discipline. Automated clash software only catches physical overlaps; it does not account for installation sequencing, pipe insulation allowances, or ongoing maintenance access.
We integrate directly with main contractors and MEP sub contractors to align design models with actual site conditions. By establishing logical routing priorities early, we protect structural clearances, prevent spatial bottlenecks, and guarantee constructible model data long before material arrives on site.
Core capabilities include: • Multidisciplinary MEP and CSA Model Federation • Spatial Conflict Resolution and Routing Prioritisation • Structural Opening and Builders Work Detail Sign Off • DfMA Support and Off Site Spooling Preparation • 2D Layout to 3D Model Conversion • ISO 19650 Information Architecture and CDE Lead • Scan to BIM Verification and Site Auditing • Total Station Point Exports for On Site Layout • As Built Model Verification and COBie Data Integration
Engineering Value Into Every System
We resolve complex routing challenges digitally to streamline installation, protect structural integrity, and accelerate project delivery on site.
Optimised Service Corridors
Heavy containment, ductwork, and pipe networks compete for identical ceiling voids and risers. We establish logical routing hierarchies that respect insulation thicknesses, structural drops, and installation tolerances so crews work without stopping on site.
Constructible Builders Work
Unplanned wall and slab penetrations cause structural delays and expensive core drilling on site. We model all MEP penetrations upfront, verifying sleeve requirements and structural allowances to generate fully approved builders work details before concrete is poured.
Offsite Prefabrication Support
High detail coordination models enable modular skid assembly and offsite pipe spooling. Shifting assembly hours from congested job sites into controlled factory conditions improves safety, increases quality control, and secures project timelines
5GW+
CRITICAL CAPACITY COORDINATED
€350K
AVERAGE PROJECT SAVING
15,000+
DESIGN CLASHES RESOLVED
275+
GLOBAL PROJECTS DELIVERED
Streamlined Coordination Workflows for Project Delivery
We coordinate complex mechanical and electrical systems digitally to ensure seamless installation across active data halls. Our specialist team maintains continuous operational protection so your live services remain completely unaffected during expansions.
ISO 19650 Information Leadership
We manage Common Data Environments and enforce strict model coordination protocols across all project disciplines. Standardising data structures ensures architects, structural engineers, and MEP sub contractors work in total alignment.
Multi-Trade Clash Auditing
We host structured digital coordination sessions with trade leads to systematically review service routing, insulation allowances, and installation access. Every spatial conflict is assigned, tracked, and resolved prior to site sign off.
As-Built Verification & Handover
Unverified model changes lead to maintenance issues after completion. We audit finished installations against initial digital coordination models, delivering accurate as-built data and structured asset records for facility management.
DCT’s Digital Construction Management team worked collaboratively with our project team, bringing a consistent and thorough approach to BIM coordination and issue management. Their experienced coordinator and engineers understand both the design intent and the realities of construction on site. Issues were clearly documented, actively followed up and driven through to resolution, rather than simply identified and reported. This collaborative and proactive approach helps resolve coordination risks early and gave our team greater confidence in the coordinated process.
Jim Peters•Bennett Construction
Director MEP Services
DCT's Digital Construction Management team caught the problems early and closed them out. Issues that would normally surface on site were resolved in the model, weeks ahead. They understood construction well enough to know which risks mattered, and they chased them to a decision rather than reporting them and moving on. It took a significant amount of risk out of our design delivery.
Brian Farrington•OCSC
Director (M&E)
DCT’s expertise in BIM implementation ensures seamless collaboration across all project phases. Their focus on effective coordination and problem solving has been invaluable, particularly in complex scenarios.
Shane Blaney•Jones Engineering
Operations Director
DCT has supported us in the delivery of fully coordinated and clash free models aligned to our key project milestones. They provide a thoroughly professional service which contributes to the overall quality of our work.
Barry Kirwan•Henry J Lyons
Director
We really appreciate the collaborative way their team worked on our project and delivering the completed models on time. We will not hesitate to call upon DCT’s modelling services on future BIM projects.